Case Study 1: Site Works
Case study 3: Scaffolding (2)
Case study 5: Edge protection
Case study 6: Elevated Working Platform
Case study 8: Demolition
References
1. In this case, the drilling operator reported the incident to the supervisor. The excavator operator was instructed to resume work after inspecting the area and making sure there was no risk of direct damage to the excavator or electric shock. Power authorities and safety inspectors later instructed the miner operator to remove the miner to ensure that any measures agreed with the power authority ....