Case Study 1: Site Works

Case study 3: Scaffolding (2)

Case study 5: Edge protection

Case study 6: Elevated Working Platform

Case study 8: Demolition

References

Case Study 1: Site Works

1. In this case, the drilling operator reported the incident to the supervisor. The excavator operator was instructed to resume work after inspecting the area and making sure there was no risk of direct damage to the excavator or electric shock. Power authorities and safety inspectors later instructed the miner operator to remove the miner to ensure that any measures agreed with the power authority ....